The Staudinger Power Plant in Großkrotzenburg is one of Uniper's most powerful power plant sites and the largest conventional power plant in Hesse.
A total of five units were operated at the site until 2012. Units 2 and 3 were finally decommissioned at the end of 2012, followed by Staudinger 1 on April 30, 2013 after 48 years of operation.
The remaining units 4 and 5 were classified by the Federal Network Agency as system-relevant until March 31, 2031. These units are now operated on behalf of the transmission system operator and continue to ensure safe and reliable grid operation.
In addition, the local community is supplied with district heating through the use of replacement boilers.
The Staudinger site is to be retained as an energy location in the future. The aim is to use the excellent infrastructure and install new systems to ensure a sustainable, reliable and flexible energy supply in the future. The Staudinger site will be transformed and make an important contribution to the energy transition.
Staudinger 4 | Staudinger 5 | |
---|---|---|
Location | Großkrotzenburg (Hesse) | Großkrotzenburg (Hesse) |
Commissioned | 1977 | 1992 |
Electrical net output | 622 MW | 522 MW |
Fuel | Natural gas | Hard coal |
Documents (German only)
Dismantling of the cooling towers of unit 1 & 2
In May 2024, the four cooling towers of the decommissioned Staudinger 1 & 2 power plant units were dismantled. Work has been carried out for several years at the Staudinger site to dismantle the units that have already been decommissioned.
It took between 60 and 90 minutes each time for the wrecking ball, which seems tiny compared to the 40-meter-high structures, to knock so many holes in the cooling towers that they collapsed. In the next steps, the outer rings and then the transmission shafts were also brought down with the wrecking ball. The rest is done by large excavators with hydraulic demolition shears.
Insight into the revision work at the Staudinger power plant
Last year, a major revision took place in unit 5 of the Staudinger power plant. The time-lapse videos created on this occasion provide an insight into the work. The revision in unit 5 took place from the end of July to the end of October 2021. During this time, an additional 350 employees from partner companies were working on the power plant site.
Staudinger news to listen (German only)
Episode 15: Rückschau 2024 und Ausblick 2025
Zu Gast: Kraftwerksleiter – Andreas Armenat
Themen: Systemrelevanz – Katastrophenschutzübung – Revisionen – Standortentwicklung – Fernwärme – Ausblick
Episode 14: Vorstellung Kraftwerksleitung
Zu Gast: Kraftwerksleiter – Andreas Armenat
Themen: Vorstellung Kraftwerksleitung – Kraftwerksbetrieb - Projekte
Episode 13: Große Revision Block
5 Zu Gast: Instandhaltungsleiter – Florian Schmidt
Themen: Große Revision – Systemrelevante Kraftwerke

Ältere Episoden
Zu Gast: Kraftwerksleiter – Matthias Hube
Themen: Abschied der Kraftwerksleitung – 60 Jahre Kraftwerk Staudinger
Zu Gast: Bereichsleiter Masterplan - Markus Anton , Geschäftsführer Fa. Mende - Jörg Mende und Sicherheitskoordinator - Rocco Nowotnik
Themen: Masterplanaktivitäten – Rückbau Kamin Block 1
Zu Gast: Kraftwerksleiter Matthias Hube & Instandhaltungsleiter Marcus Langer
Themen: Stillstandsarbeiten Block 5 - aktuelle Erzeugungslage
Episode 9: Rückschau 2021 und Ausblick 2022
Zu Gast: Kraftwerksleiter Matthias Hube
Themen: Stilllegung Block 5 - Masterplan – aktuelle Marktsituation – Ausblick 2022
Episode 8: Aktuelle Instandhaltungsmaßnahmen
Zu Gast: Instandhaltungsleiter Marcus Langer
Themen: Aktuelle Produktion – Große Revision
Episode 7:Schichtdienst im Kraftwerk Staudinger
Zu Gast: Schichtführer Thomas Hempel
Themen: Schichtdienst im Kraftwerk - Qualifikation und Hauptaufgaben eines Kraftwerkers - Stromlieferung - Diversity: Frauen im Schichtdienst - Kohleausstieg
Episode 6: Einsatz/Betrieb des Kraftwerks
Zu Gast: Kraftwerksleiter Matthias Hube und Produktionsleiter Christoph Kreis
Themen: Betrieb der Blöcke 4 und 5 - Netzstabilität - Stromschwemme (zu viel Strom im Netz) - Infos zu Abriss bzw. Rückbau - Entwicklung Fernwärme-Folgelösung für die Gemeindewerke Großkrotzenburg
Episode 5: Rückschau 2020 und Ausblick 2021
Zu Gast: Kraftwerksleiter Matthias Hube
Themen: Infos zu BnBm-Anlage - Fernwärme-Folgelösung - Infos zu Betrieb - Standortneuausrichtung Konzern-Invest - Erfolgreich trotz Pandemie - Ausblick 2021
Episode 4: Ausbildung am Standort Staudinger
Zu Gast: Ausbilder Stefan Burgard und Florian Tippelt
Themen: Allgemeine Infos zur Ausbildung am Standort - Entwicklungsmöglichkeiten - Erwartungen an zukünftige Auszubildende - Perspektiven
Episode 3: Standort-Neuausrichtung /Masterplan
Zu Gast: Bereichsleiter Quality & Performance Markus Anton und Teilbereichsleiter Produktion Thomas Messerschmidt
Themen: Planungen zum Rückbau - Infos zu aktuellen Projekten - Niederlegung Kühlturm Block 3 - Fernwärmeversorgung
Episode 2: Stillstand bzw. Revision in den Blöcken 4 und 5
Zu Gast: Produktionsleiter Christoph Kreis und Instandhaltungsleiter Markus Langer
Themen: Umgang mit Stillstand bzw. Revision während Pandemie - Aktuelles zum Teilabriss der beiden Schornsteine1 + 2
Episode 1: Aus dem Kraftwerk Staudinger
Zu Gast: Kraftwerksleiter Matthias Hube
Themen: Corona und die Auswirkungen auf die Arbeit im Kraftwerk Staudinger - Neues zu den Masterplanaktivitäten - Information zu Stilllegungsankündigung Block 5 - Stand zu Fernwärmeversorgung - Block 4 weiterhin systemrelevant