Humber H₂ub® (Green) project

Das Humber H₂ub®-Projekt (Grün)

Das Humber H₂ub®-Projekt (Grün)

Humber H₂ub® (Green) project

Uniper aims to be carbon-neutral by 2040* and will invest around €8 billion until the early 2030s, to significantly grow low carbon and flexible power. We are progressively expanding our gas portfolio to include low carbon gases like hydrogen and aim to convert to these gases over the long term. 

As part of this, Uniper is exploring the potential development of a new electrolytic (green) hydrogen production facility at our Killingholme site which could contribute to the decarbonisation of the industrial Humber.  

The development of low carbon hydrogen production at Killingholme could create opportunities during the construction phase and once it becomes operational, provide permanent highly skilled jobs as well as helping to safeguard jobs in the wider area. 

About the project

About the project

The Humber H2ub® (Green) project is a proposed low carbon hydrogen production facility at Uniper’s Killingholme site. It would include electrolytic (green) hydrogen production capability, which meets the UK Low Carbon Hydrogen Standard, with an initial capacity of up to 120MW and potential future expansion of a further 200MW+. In March 2024, Uniper and Phillips 66 Limited signed a collaboration agreement to work together towards a supply of electrolytic (green) hydrogen from the Humber H2ub® (Green) project to Phillips 66 Limited’s Humber Refinery. The hydrogen would be used to replace some refinery fuel gas in industrial scale fired heaters as part of Phillips 66 Limited’s plans to reduce the Humber Refinery’s scope 1 operational emissions. 

The project is targeted to be operational by 2029. 

Hydrogen is a key fuel that can be used in heavy industry, transport and power generation. The technology for producing hydrogen already exists and is proven. All types of low carbon hydrogen will be needed at scale, including both electrolytic (green) hydrogen, which is produced from renewable energy sources, and more conventional hydrogen-production methods combined with carbon capture and storage technologies. Once produced, hydrogen can also be refined into renewable liquid fuels – such as synthetic diesel and sustainable aviation fuel – providing a clean energy source for vehicles and whole industries that currently rely on carbon-intensive fuels.   

For the Humber, hydrogen offers a low carbon alternative for those parts of the regional economy, which are more difficult to decarbonise, such as its heavy industry, supporting the region’s transition to a decarbonised future.  

The Humber is one of four target locations in the UK, recognised by the Government as an ideal area for the creation of new industrial hubs; combining all the required elements to link decarbonised energy, transport and industry. 

Situated in the heart of the industrial Humber, our Killingholme site has huge potential as an energy transformation hub, supporting the region’s transition to a decarbonised future. It is an ideal location for large-scale low carbon hydrogen production. It offers a suitable large plot space to facilitate electrolysis-based hydrogen production, adjacent to existing industrial facilities which are seeking to decarbonise. 

The hydrogen produced by the Humber H2ub® (Green) project could be used in those parts of the regional economy which are more difficult to decarbonise (such as heavy industry, transport, and power). The electrolytic (green) hydrogen production facility would be developed as part of Uniper’s wider aspirations for our Energy Transformation Hub Killingholme. 

Humber hub2

The Humber region is recognised as the UK’s most carbon intensive industrial region and hydrogen will be vital in decarbonising and securing the region’s economy. As part of a first phase of hydrogen refuelling to reduce some of the Humber Refinery’s scope 1 operational emissions, Phillips 66 Limited plans to take around 45 tonnes per day of electrolytic (green) hydrogen (equivalent to 100MW electrical capacity) from our proposed Humber H2ub® (Green) development. This would contribute to a saving of around 100,000 tonnes of CO2 a year, as part of Phillips 66 Limited's wider plans to reduce scope 1 emissions at the refinery. 

The potential development of a hydrogen production facility at our Killingholme site could also help to maintain economic prosperity in the Humber region. Based on our initial assessments, we anticipate that if consented and developed, the Humber H2ub® (Green) electrolytic hydrogen production facility could create up to 110 jobs on site during construction and up to 440 jobs for the UK as a whole. Based on pre-FEED assessments, we anticipate the proposed facility could create approximately 13 permanent full and part time operational roles. 

As well as the permanent on-site jobs that are expected to be created once Humber H2ub® (Green) becomes operational, the electrolytic (green) hydrogen production facility could support over 100 additional jobs across the region and wider UK associated with its maintenance and electricity supply. Operation of the proposed facility is also expected to deliver over £40m per annum of GVA in present value terms for the UK economy. Of this, up to £20m per annum could benefit the Yorkshire and Humber region.

Project plans

Project plans

The proposed new hydrogen production facility would be built on Uniper’s land at Chase Hill Road, Killingholme, adjacent to the existing power station.

The map below shows the indicative location for any new infrastructure that would be built on our site, as part of the proposed Humber H2ub® (Green) project. Please note that these plans are still in an early stage of development and are subject to change following feedback and consultation with the local community, local authorities and other organisations.

The final design will be determined during Front End Engineering Design (FEED) studies.

Proposed site plan

Image shows indicative site plan.

The specific technology requirements and design of the proposed facility will be determined during the Front-End Engineering and Design (FEED) phase. However, our preliminary design work suggests that no part of the proposed Humber H2ub® (Green) project development will be higher than the existing power station. The image below provides a computer-generated representation showing what it could look like.  

Computer generated image showing the proposed development

The Humber H2ub® (Green) project plans to produce electrolytic (green) hydrogen which meets the UK Low Carbon Hydrogen Standard. Electrolytic, or green hydrogen, is hydrogen produced via a process of electrolysis, which is splitting water into oxygen and hydrogen, using electricity from renewable and other sources of low carbon power. 

The electricity for the Humber H2ub® (Green) hydrogen project could come from a range of sources; future on site development, renewable generation, as well as low carbon power generation, either directly connected to the electrolyser or via the national grid, enabled by power purchase agreements and renewable guarantees of origin.

In March 2024, Uniper and Phillips 66 Limited signed a collaboration agreement to work together towards a supply of electrolytic (green) hydrogen from the Humber H2ub® (Green) project to Phillips 66 Limited’s Humber Refinery. The hydrogen would be used to replace some refinery fuel gas in industrial scale fired heaters as part of Phillips 66 Limited’s plans to reduce the Humber Refinery’s scope 1 operational emissions. 

Indicative timeline

Indicative timeline

Proposals to develop a new low carbon hydrogen production facility at our Killingholme site are at a very early stage. 

In September 2025, we submitted our planning application to the local planning authority, North Lincolnshire Council (NLC) under the Town and Country Planning Act 1990. 

Before submission of the planning application, Uniper carried out a programme of public consultation, as agreed with the local planning authority who will determine the project’s planning application. This consultation programme provided an opportunity for local communities and stakeholders to ask questions and provide feedback on our proposals, and where possible, helped to inform our planning application to the Council. 

Our public consultation for the Humber H2ub® (Green) project proposals ran from 8-29 November 2024, including a drop-in public consultation session on 19 November 2024 at North Killingholme village hall. For more information on our consultation please visit our dedicated consultation website here.

The next stage in the project is due to be the Front-End Engineering Design (FEED) phase, expected to start in early 2026, which will determine the final design for the proposed facility, ahead of a final investment decision. Construction would then start subject to gaining the necessary planning approvals and a successful financial investment decision, with potential operation by 2029. 

November 2024

Public consultation held

September 2025

Planning application submitted

2026

FEED to commence

2026

Financial investment decision

2029

Commissioning

2029

Commercial operation

More information

In this section you will find additional information on regional developments.

Project documents

Project documents

Humber Hub Green consultation newsletter
PDF - 2.45 MB
Your questions

Your questions

Uniper aims to be carbon-neutral by 2040* and is investing around 8 billion euros in its strategic transformation until the early 2030s. Through investments in renewable energy, hydrogen and other low-carbon energy carriers, Uniper is also driving the transformation of the energy system. 

We have also invested to enable the integration of more renewables onto the UK energy system by providing dedicated inertia services to the National Electricity System Operator (NESO) at our Killingholme and Grain facilities.

The development of a large scale hydrogen production hub at Killingholme could supply local industry, power and transport, on the South Humber bank and beyond. There is also the potential for the hydrogen to be used as an alternative fuel to natural gas to decarbonise the existing power station; however this is not the initial focus for the project.

The best solution for delivering the hydrogen produced at Killingholme will be determined during Front End Engineering Design (FEED) studies, which are due to take place from 2026. However, it is anticipated that the hydrogen will be delivered via a dedicated pipeline.  

The pipeline route is still to be decided, but options currently under consideration include an eastern route that would follow Rosper Road before entering the refinery, and a western route. A decision on the preferred pipeline route will be made prior to the submission of our pipeline planning application and following the conclusion of discussions with the landowners along the routes being considered.

Uniper has a long-standing presence at Killingholme and understands the importance of being a good neighbour. As part of our Environmental Impact Assessment, we have carried out a traffic and transport assessment that concluded there is no significant impact expected during construction. 

We will continue to work with Highways England (HE) and North Lincolnshire Council to evaluate which roads may be used to access the site, and recommend appropriate measures to help manage construction traffic levels effectively.

A Construction Traffic Management Plan (CTMP) will be prepared as part of the next phase of the project.

The design of the proposed facility will be determined during the front end engineering and design (FEED) phase that is expected to start in early 2026. Our current expectation is that during construction and operation of the proposed facility, traffic would access the Humber H2ub® (Green) site from our Killingholme Power Station’s existing access point on Chase Hill Road.

It is anticipated that heavy goods vehicle (HGV) construction traffic would follow a route from the A180 onto the A160 and then along Eastfield Road before turning onto Chase Hill Road to reach the site. Exiting traffic would turn left onto Chase Hill Road and follow the continuation as Rosper Road to return to the A160 and A180. These arrangements offer a turn left in / left out for HGVs during the main construction works and would avoid the main residential areas along East Halton Road.

As part of our Environmental Impact Assessment, we have carried out a traffic and transport assessment that concluded that there is no significant impact expected. A Construction Traffic Management Plan (CTMP) will be prepared as part of the next phase of the project.

We submitted our planning application to North Lincolnshire Council (NLC) in September 2025, under the Town and Country Planning Act 1990. 

Before submission of the planning application, Uniper carried out a programme of public consultation, as agreed with the local planning authority – North Lincolnshire Council - who will determine the project’s planning application. This consultation programme provided an opportunity for local communities and stakeholders to ask questions and provide feedback on our proposals, and where possible, helped to inform our planning application to the Council. 

Our public consultation for the Humber H2ub® (Green) project proposals ran from 8-29 November 2024, including a drop-in public consultation session on 19 November 2024 at North Killingholme village hall. For more information on our consultation please visit our dedicated consultation website here.

Uniper has a long-standing presence at Killingholme and understands the importance of being a good neighbour. To ensure local people are consulted on our proposals, we agreed a programme of public consultation with the local planning authority – North Lincolnshire Council - who will determine whether the project can go ahead. This consultation programme provided an opportunity for local communities and stakeholders to ask questions and provide feedback on our proposals, and where possible, will help to inform our planning application to the Council.  

For more information on our consultation and details of how you can have your say, please visit our dedicated consultation website at https://uniperuk.consulting/hhgreen/.

Contact us

If you would like to talk to us about the project, you can contact our Community Relations Team using the following contact information: 

Call us on 0800 066 8941

Email us at hhgreen@communityfeedback.co.uk

Write to us at Freepost Humber H2ub (Green)

Visit our dedicated consultation website at https://uniperuk.consulting/hhgreen/

Contact us

Press enquiries for the Humber H2ub® (Green) project

Sara Revell

Uniper in the UK: Spokesperson
Portrait of Sara Revell

More projects and services in the Humber region

Potential development site of proposed KLCP project

Killingholme Low Carbon Power

The potential development of a new carbon capture power station in the UK’s Humber region.

Hydrogen Storage Diagram 2 Salinae UK

Salinae Hydrogen Storage project

The Salinae Hydrogen Storage project is a potential salt cavern hydrogen storage development in Cheshire, in the UK.

Killingholme 1

Energy Transformation Hub Killingholme

Uniper’s Killingholme site can play a key role in the decarbonisation and economic growth of the region.

Grid stability_Killingholme

Innovative grid stability services

Uniper's Killingholme and Grain power station sites offer essential grid stabilising services to Great Britain's National Energy System Operator without the need to combust fuel to generate power.